Landmark was retained by the project architect to develop the site civil bridging documents for the design-build Vehicle Maintenance Shop facility at FMS #5 – Dagsboro Readiness Center. The Delaware Army National Guard (DEARNG) project replaced an existing 13,000 square foot building with a new 16,000 square foot, state-of-the-art Vehicle Maintenance Shop Facility that will […]
Client Type: Construction — CM, DB, GC
DAFB Mobile Tail Enclosure
The Mobile Tail Enclosure is a moveable mini hangar that will allow Building 712 to mimic a full-in hangar for use by Dover Air Force Base’s 512th and 436th Maintenance Groups. It is a 99-foot tall by 100-foot wide structure, with its own fire suppression and electrical system, which are required for safety purposes, and […]
DAFB Air Freight Hangar
A damaged air freight hangar located on the Dover Air Force Base in close proximity to a C-5 taxiway needed to be demolished and replaced with the construction of a new 350,000+ square foot air freight terminal hangar. Landmark’s survey staff provided all necessary boundary and topographic surveys for roads and utilities, attended project construction […]
AASF Helicopter Hangar Expansion
Landmark was retained by the project architect to provide civil engineering services required for a renovation and expansion of the Army Aviation Support Facility (AASF) for the Delaware Army National Guard. The DEARNG’s Black Hawk helicopter maintenance and hangar facilities are located at the New Castle County Airport in New Castle, Delaware. The project included […]
Wawa Stores / Gas Fueling Stations
Landmark has provided the planning and design for numerous Wawa retail stores with gasoline fueling pumps, including both new, redevelopment, and expansions of facilities in Delaware and Maryland. Examples includes: New Pencader Corporate Center (SR 896), Newark Redevelopment at US 13 & I-295 (Red Rose Motel), New Castle Redevelopment of Elkton & Fletchwood Roads site, […]