The Zenith Products facility was developed and constructed as an integrated design project within the 500-acre Riveredge Industrial Park in the City of New Castle. Landmark worked directly for Norwood Construction to complete the design and construction of this 490,000+ square foot warehouse with attached 49,000 square foot office facility. Parking lots, access roads, and […]
Location: Delaware
Corporate
500 Delaware Avenue Office & Garage
The 500 Delaware Avenue commercial office building has 371,000 square feet in a 15-story, high-rise building with an attached, six-story, 550-car parking garage. The project was constructed on a confined site in a highly developed urban setting at the gateway to the City of Wilmington’s Central Business District. Located within the WSFS Bank Center (recognized for […]
La Grange Residential
La Grange is a residential development that extends along the LaGrange Parkway from Pulaski Highway (US Route 40) into a densely wooded area that backs to the Muddy Run Creek in Glasgow, Delaware. The subdivision includes 227 lots featuring a mix of single family homes and two types of twin dwellings. Scope of Services Landmark Science […]
Fenwick Island Ped. Improvements
The Town of Fenwick Island considered adding sidewalks along Route 1 to improve pedestrian safety in their high-traffic, beachside town. Landmark was retained to conduct a pedestrian improvement study and, the following year, to prepare a concept plan for a town-wide sidewalk improvement project. Design included sidewalks, curbs, entrance, handicap ramps, rain gardens, and parking. […]
Eagle Run Road Connector
Eagle Run Road connector is an award winning project involving a one-mile roadway extension that required stream stabilization for two bridge spans, extensive environmental services, and design for one mile of roadway widening. The project won the engineering excellence Conceptor Award in 2020 for the work completed by Landmark’s staff who performed integrated science and […]