Crystal Run ES at Summit Campus

Crystal Run ES at Summit Campus

Crystal Run ES Front Entrance
Front Entrance to Crystal Run Elementary School

Landmark Science & Engineering was selected to work with the Owner to develop the Summit Campus – a new 142-acre pre-K to 12 full school campus in southwestern New Castle County, off S.R. 896, named for its proximity to Summit Aviation.

Phase I construction includes Crystal Run Elementary School (90,5000+/- SF), full site entrance on Summit Bridge Road, off-site road improvements, off-site sewer improvements, and a portion of the site improvements. Vehicle and pedestrian improvements include inner and outer loop drives as well as multimodal paths throughout campus.

Scope of Work

Crystal Run ES rear of school building
From the rear of Crystal Run, school building, the dual-striped vehicle-bus parking, playground and stormwater management pond can be seen

Landmark has provided planning, surveying, environmental services including forest stand delineation, wetland delineation, permitting coordination across state and federal agencies, and bog turtle investigations, site design, stormwater management BMP design, and DelDOT entrance design. A Site Record Plan has been recorded and Site Construction Plans were prepared for Phase I construction. Construction phase services were provided including survey stakeout, as-builts, and CCR services.

Design team cuts ribbon at Crystal Run ES
Design and Construction Team at the Ribbon Cutting on August 31, 2023
Design/Construction Team at Beam Signng
Design and Construction Team at the Beams Signing on November 15, 2022

Project Timeline

Landmark staff has been present for every project milestone, from the Ground Breaking Ceremony on November 15, 2021, to the Beam Signing Ceremony on November 4, 2022, to the Ribbon Cutting Ceremony on August 31, 2023 as the new school year was about to commence.